TABLE OF CONTENTS
Preamble
- new school file set up
- synchronisation processes
- synchronisation troubleshooting
Type of sync
Which data is sent to the other system?

Tes Timetable feature | Notes on feature | Is this feature received by the other system? | Other notes |
Bell times | Bell times as per Grid structures | Yes | |
Campuses | Campuses and their associated rooms | Yes | |
Classes | Class code, GUID, Faculty, Course Name, Assigned teacher | Yes | |
Class lists | Yes | ||
Composite classes (linked classes) | One teacher teaching more than one class at the same time | Yes | |
Duty roster | Yes | ||
Faculty data | Yes | ||
Grid structure codes | Yes | As part of multigrid structure. | |
Multi-file | Two (or more) timetable files | Yes | |
Multi-grid | Multiple grids with different bell times | Yes | |
On-call roster | Yes | ||
Priority classes | The priority class that shows on student's timetables where they have class clashes | Yes | |
Room data | As per the room data screen. | Yes | |
Rotation classes | Classes from particular rotations | Yes | Only shows current rotation classes that is selected in Settings>File>Current rotation |
RTO roster | Yes | ||
Student data | Student Code, Name, Preferred name, Year level, Gender, Email | Yes | |
Study roster | Study classes, staffing and rooming roster | Yes | |
Sub-classes | Yes | Note: send a sample file with sub classess to be tested. | |
Teacher data | Teacher Code, Name, Preferred name, Faculty, Gender, GUID | Yes | |
Teacher 'Days Available' | Yes | ||
Timetable data | Yes | ||
Two (or more) rooms at once | Yes | ||
Two (or more) teachers at once | Yes | ||
Year levels (non-numeric) | Year levels such as SPT, LSUP, ROLL, Yr9+10 etc... | Yes |
Steps to Synchronise data
Step 1: Check if any Posimente set up is required
Step 2: Configure the Tes timetable file
- Go to File > Synchronise > Configure
- Select the ‘Sync’ sub-tab
- Click the '+' and select "Posimente" from the dropdown
Go to the ‘Connection’ sub-tab
Ensure that “Posimente” is selected in the top-right corner
Input your credentials. Posimente will provide you with the URL, Username, Password, School code, Client Id, Client Secret.
Proxy - Not usually required. See your school network administrator if a proxy message appears after testing your connection.
Test Connection - Click "Test Connection" to confirm if connection is successful.
9. Go to the ‘Other sub-tab and change any options to your preference.
Option | Details |
Sync timetable & class lists every time you save | This will send only the timetable and class membership data to Posimente each time you save the file |
Exclude Yard duties | When ticked Yard duties will be ignored for syncing purposes |
Exclude Study classes | When ticked Study classes will be ignored for syncing purposes |
Exclude On-calls | When ticked On-calls will be ignored for syncing purposes |
Accept Statewide ID's that are sent to Tes | This allow to import the student's statewide ID in Student Data > Statewide ID column |
Which years? | This option allows you to select the specific year levels to sent to Posimente. Please leave all of the year levels un-ticked if you want all year levels to be synced. Note. This function will only appear if the timetable file is Multi grid. |
Step 3: Perform the sync
Basic Sync
To perform a Basic sync:
Go to File > Synchronise > Sync Now, and select the ‘Basic’ sub-tab
Ensure “Posimente” is selected from the dropdown in the top-right corner
Input the date range you wish to update the Posimente data in and select the rotation you wish to sync
Click “Go” to sync
- Check course codes: This option will flag classes that got the same course codes but different subject names, Posimente will process both courses as one subject. E.g. 12ENG1 - English and 12ENGA - Engineering. Course code for both classes is '12ENG' and Posimente would label both as either 'English' or 'Engineering'.
Advanced Sync
To perform a advance sync:
Go to File > Synchronise > Sync Now, and select the ‘Advanced’ sub-tab
Ensure “Posimente” is selected from the dropdown in the top-right corner
Select which data you wish to sync with Posimente
Input the date range you wish to update the Posimente data in and select the rotation you wish to sync
Click “Go” to sync

Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article